提案
227当前区块高度 2,345,488
筛选与排序
提案 #112,普通提案已结项
ElastOS Runtime - reinstating the missing pillar with Elacity.
预算 65,000 ELA,4 次进度更新
结项报告已获批,已拨付 5/6 期
提案 #109,普通提案已通过
Reduce minimum pledge duration (ELA lockup time) for freshly registered DPoS 2.0 Supernodes
预算 0 ELA
无拨款提案,结项报告获批后结项